Sacramento Distribution & Manufacturing.
About 99% built out, current owner has put in over $100k into the buildout and licensing process that the new owner could be operational within 45 days.
Originally the building was fitted for Cultivation, meaning there is more than enough power, upgraded ventilation, massive AC unit, etc.